DocumentCode
2846537
Title
Experimental validation of time optimal MPC on a flexible motion system
Author
Van den Broeck, L. ; Diehl, M. ; Swevers, J.
Author_Institution
Dept. of Me- chanical Eng., K.U.Leuven, Leuven, Belgium
fYear
2011
fDate
June 29 2011-July 1 2011
Firstpage
4749
Lastpage
4754
Abstract
This paper discusses the application and experimental validation of time-optimal model predictive control (TOMPC) on a flexible motion system, an overhead crane with fixed cable length. TOMPC realizes minimal settling times for point-to-point motions taking into account system constraints. Results of several different point-to-point motion experiments and of disturbance rejection experiments clearly demonstrate this time optimal behavior. The extension of the TOMPC algorithm to increase its feasibility range required for large point-to-point motions is discussed and validated.
Keywords
cranes; motion control; predictive control; disturbance rejection; fixed cable length; flexible motion system; overhead crane; time optimal MPC; time-optimal model predictive control; Cranes; Mechatronics; Optimal control; Optimization; Real time systems; Trajectory;
fLanguage
English
Publisher
ieee
Conference_Titel
American Control Conference (ACC), 2011
Conference_Location
San Francisco, CA
ISSN
0743-1619
Print_ISBN
978-1-4577-0080-4
Type
conf
DOI
10.1109/ACC.2011.5990773
Filename
5990773
Link To Document