DocumentCode
2847647
Title
An improved multi-mode resource allocation and project scheduling model
Author
Haji, Maryam ; Agostoni, Luca ; Gullo, Paolo ; Darabi, Houshang ; Mancini, Mauro
Author_Institution
Dept. of Mech. & Ind. Eng., Univ. of Illinois at Chicago, Chicago, IL
fYear
2008
fDate
23-26 Aug. 2008
Firstpage
365
Lastpage
370
Abstract
In this paper we extend the Petri net based scheduling model that was previously introduced (2007). The integer programming (IP) model of the scheduling problem stated previously may yield an optimal solution that is not an implementable (feasible) schedule. In this situation other alternate optimal solutions of the IP model, if any, must be generated and checked whether they are feasible schedules. The process of generating alternate optimal solutions can be very time consuming or computationally impractical. In this paper, we provide a modified IP model that its optimal solution is always an implementable schedule. With this modification, there is no need to generate alternate optimal solutions. This modification significantly reduces the time required to produce an implementable schedule.
Keywords
Petri nets; integer programming; project management; resource allocation; scheduling; IP model; Petri net; improved multi mode resource allocation; integer programming; optimal solutions; project scheduling model; Automation; Bridges; Costs; Genetic algorithms; Industrial engineering; Job shop scheduling; Mathematical model; Processor scheduling; Resource management; Supervisory control;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering, 2008. CASE 2008. IEEE International Conference on
Conference_Location
Arlington, VA
Print_ISBN
978-1-4244-2022-3
Electronic_ISBN
978-1-4244-2023-0
Type
conf
DOI
10.1109/COASE.2008.4626461
Filename
4626461
Link To Document