DocumentCode
2857889
Title
Partial global flexible scheduling for coordinating resource-bounded agents
Author
Mouaddib, Abdel-Illah
Author_Institution
CRIL, IUT de Lens, France
fYear
1998
fDate
3-7 Jul 1998
Firstpage
453
Lastpage
454
Abstract
We have presented the partial global flexible scheduling approach that proposes using distributed artificial intelligence methods combined with scheduling techniques to the control of progressive reasoning units which are distributed, self-interested, want to maximize their own performance and there is no central controller available.
Keywords
cooperative systems; inference mechanisms; scheduling; software agents; distributed artificial intelligence methods; partial global flexible scheduling; progressive reasoning units; resource-bounded agents coordination; scheduling techniques; Airports; Broadcasting; Centralized control; Control systems; Lenses; Level set; Postal services; Real time systems; Robot kinematics; Scheduling algorithm; Sorting; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Multi Agent Systems, 1998. Proceedings. International Conference on
Print_ISBN
0-8186-8500-X
Type
conf
DOI
10.1109/ICMAS.1998.699282
Filename
699282
Link To Document