DocumentCode
2858333
Title
Shifting economic bottleneck identification
Author
Wang, Junqiang ; Chen, Jian ; Wang, Shuo ; Zhang, Yingfeng ; Sun, Shudong
Author_Institution
Northwestern Polytech. Univ., Xi´´an, China
fYear
2011
fDate
6-9 Dec. 2011
Firstpage
1760
Lastpage
1764
Abstract
Shifting economic bottleneck identification aims to improve the overall throughput of manufacturing system. Firstly the two new concepts, throughput sensitivity of machine and corresponding economic bottleneck, are mathematically defined. Secondly considering both throughput effect and active duration of machine, a new two-dimensional bottleneck indicator named active throughput and duration (ATD) is presented and new concave-convex Gantt chart is given for scheduling representation. Thirdly the shifting economic bottleneck identification (SEBI) method is presented to identify either the momentary economic bottleneck or statistically stable bottleneck. What´s more, it also works well when facing the sole economic bottleneck, multiple economic bottlenecks and shifting economic bottleneck. Finally a practical job shop scheduling problem is optimized and the bottleneck identification is gained by the proposed method. Also a comparison between the proposed method and existing method is made. The results show that the proposed approach is effective and explicit for shifting economic bottleneck identification.
Keywords
bar charts; concave programming; convex programming; economics; job shop scheduling; manufacturing systems; statistical analysis; active throughput and duration; concave-convex Gantt chart; job shop scheduling problem; manufacturing system; momentary economic bottleneck; scheduling representation; shifting economic bottleneck identification; statistically stable bottleneck; throughput sensitivity; two-dimensional bottleneck indicator; Economics; Genetic algorithms; Job shop scheduling; Manufacturing systems; Mathematical model; Throughput; Economic bottleneck; active throughput and duration; bottleneck identification; job shop scheduling; shifting bottleneck;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location
Singapore
ISSN
2157-3611
Print_ISBN
978-1-4577-0740-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2011.6118218
Filename
6118218
Link To Document