• DocumentCode
    2868709
  • Title

    Project or Process? How to Measure the Real Type of Employees´ Activity?

  • Author

    Romanov, Dmitry ; Sidorov, Pavel

  • Author_Institution
    Higher Sch. of Econ., Moscow, Russia
  • fYear
    2011
  • fDate
    12-14 Dec. 2011
  • Firstpage
    1084
  • Lastpage
    1088
  • Abstract
    By analyzing the logs of corporate e-mail networks we found a number of patterns, showing how the size of ego-networks of individual employees changes on a day by day basis. We proposed a simple model that adequately describes the observed time dependence of an employee\´s "social circle". Comparison of experimental data with the theoretical model showed that employees are divided into two groups - with fast and slow changes in their social circles, respectively. We believe that the presence of these groups reflects both project-type and process-type of employees\´ activities. Comparison of data obtained before and during the global economic crisis has shown that the crisis led to an actual reduction in project-type activities.
  • Keywords
    electronic mail; e-mail networks; economic crisis; ego networks; individual employees; social circle; Approximation methods; Companies; Electronic mail; Mathematical model; Social network services; business process; ego network; project management; social circle;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Dependable, Autonomic and Secure Computing (DASC), 2011 IEEE Ninth International Conference on
  • Conference_Location
    Sydney, NSW
  • Print_ISBN
    978-1-4673-0006-3
  • Type

    conf

  • DOI
    10.1109/DASC.2011.178
  • Filename
    6119065