    EMC Based Risk Assessment System and Empirical Analysis of BIPV Projects

  • Author

    Liu, Yi ; Zhang, Xu ; Ma, Min

  • Author_Institution
    Sch. of Bus. & Adm., North China Electr. Power Univ., Beijing, China
  • Volume
    1
  • fYear
    2009
  • fDate
    16-18 Oct. 2009
  • Firstpage
    113
  • Lastpage
    116
  • Abstract
    This paper was based on the general theory of EMC and risk management, by analyzing the risk in the construction and operation of solar energy construction projects, proposed a risk evaluation index system for solar energy construction projects. Then an empirical research was carried out with AHP and fuzzy approach for the risk of a solar energy construction project, with a hope of giving some reference to the construction and promotion of solar energy construction projects in China.
  • Keywords
    construction; power system management; risk management; solar power stations; AHP; BIPV projects; EMC based risk assessment system; construction and operation; empirical analysis; fuzzy approach; risk evaluation index system; solar energy construction projects; Building integrated photovoltaics; Costs; Electromagnetic compatibility; Energy management; Investments; Management training; Project management; Risk analysis; Risk management; Solar energy; BIPV(Building Integrated Photovoltaics); EMC(Energy Management Contracting); risk;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy and Environment Technology, 2009. ICEET '09. International Conference on
  • Conference_Location
    Guilin, Guangxi
  • Print_ISBN
    978-0-7695-3819-8
  • Type

    conf

  • DOI
    10.1109/ICEET.2009.34
  • Filename
    5366921