DocumentCode
2880739
Title
Cardiff Telephone Exchange - Total Energy Project
Author
White, I G
Author_Institution
BRITISH POST OFFICE TELECOMMUNICATIONS HEADQUARTERS
fYear
1979
fDate
26-29 Nov. 1979
Firstpage
198
Lastpage
203
Abstract
The paper covers the basic factors which were taken into account when considering the installation of a Total Energy System in a major communications centre. It also describes the main components of the plant which is currently being commissioned ready for service. Tentative conclusions are given suggesting some limitations to the more widespread use of Total Energy Systems in telecommunications buildings.
Keywords
Cooling; Fuel economy; Heat recovery; Petroleum; Power generation economics; Space heating; Telephony; Tellurium; Waste heat; Water heating;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1979. INTELEC 1979. International
Conference_Location
Washington, DC, USA
Type
conf
DOI
10.1109/INTLEC.1979.4793628
Filename
4793628
Link To Document