• DocumentCode
    2893044
  • Title

    Present status of J-PARC Ring RF systems

  • Author

    Yoshii, M. ; Anami, S. ; Ezura, E. ; Hara, K. ; Hashimoto, Y. ; Ohmori, C. ; Takagi, A. ; Toda, M. ; Haga, K. ; Hasegawa, K. ; Nomura, M. ; Schnase, A. ; Tamura, F. ; Yamamoto, M.

  • Author_Institution
    KEK, Tsukuba
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    1511
  • Lastpage
    1513
  • Abstract
    The rapid cycling synchrotron (RCS) radio frequency accelerating systems have been prepared for the beam commissioning scheduled in the middle of September 2007. Installations of cavities, power supplies and amplifiers were carried out. Also, the systems have been checked for the combined operations. For the main synchrotron (50 GeV-MR) accelerating systems, the high power examinations and final adjustments are ongoing. Installations are planned for September 2007. Here, we report on various issues that had been found and solved during the examination and installation period.
  • Keywords
    accelerator RF systems; accelerator cavities; particle accelerator accessories; synchrotrons; J-PARC ring RF systems; accelerator cavities; amplifiers; power supplies; rapid cycling synchrotron RF accelerating systems; Acceleration; Coatings; Magnetic cores; Magnetic materials; Particle beams; Production; Radio frequency; Radiofrequency amplifiers; Synchrotrons; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440806
  • Filename
    4440806