• DocumentCode
    2893509
  • Title

    Schedule evolution during the life-time of the LHC project

  • Author

    Barbero-Soto, E. ; Foraz, K. ; Gaillard, H. ; Hauviller, C. ; Weisz, S.

  • Author_Institution
    CERN, Geneva
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    1592
  • Lastpage
    1594
  • Abstract
    The Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical development, procurement, logistics and organization) have impacted on the schedule evolution through the lifetime of the project. It describes the cause effect analysis of the major rescheduling that occurred during the installation of the LHC and presents some general conclusions potentially applicable in other projects.
  • Keywords
    beam handling techniques; cryogenics; installation; ion accelerators; proton accelerators; storage rings; synchrotrons; CERN; Cryogenic Line Installation; Large Hadron Collider Project; aggressive installation planning; first general co-ordination schedule; spatial integration; Cause effect analysis; Civil engineering; Cryogenics; Delay; Large Hadron Collider; Logistics; Mexico Council; Procurement; Project management; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440833
  • Filename
    4440833