• DocumentCode
    2896144
  • Title

    Taking full advantage of utility deregulation

  • Author

    Cunningham, P.R.

  • Author_Institution
    Altus Group, Arlington, TX
  • fYear
    1997
  • fDate
    20-24 Apr 1997
  • Firstpage
    385
  • Lastpage
    395
  • Abstract
    Combining the power of electric utility deregulation with in-plant energy upgrades can provide dramatic improvements in cement plant profitability. Often overlooked in the push for greater production, enlightened utility management now offers one of the cheapest, most cost effective ways to lower operating costs. This paper is a case study of the results of such a program in a major midwestern USA cement plant
  • Keywords
    cement industry; economics; electricity supply industry; energy conservation; industrial power systems; power consumption; USA; case study; cement plant power systems; electric utility deregulation; in-plant energy upgrades; management; operating costs; Contracts; Cost function; Implants; Industrial relations; Manufacturing; Monitoring; Natural gas; Production; Profitability; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference. 1997. XXXIX Conference Record., 1997 IEEE/PCA
  • Conference_Location
    Hershey, PA
  • ISSN
    1079-9931
  • Print_ISBN
    0-7803-3962-2
  • Type

    conf

  • DOI
    10.1109/CITCON.1997.599410
  • Filename
    599410