DocumentCode
2900703
Title
Exploitation on the Knowledge Transfer of the Time-Cost Optimization
Author
Wan, Lijun ; Wang, Yang
Author_Institution
Harbin Normal Univ., Harbin, China
fYear
2009
fDate
24-26 Nov. 2009
Firstpage
1335
Lastpage
1338
Abstract
The converting of tacit knowledge is the key of enterprise knowledge management. It facilitates the knowledge transferring between the contractor and subcontractors. Based on the difficulties in the process of knowledge transfer, this paper has focused on the manifesting the implicit knowledge by using the comparisons method. This paper emphatically introduces a series of institutional innovations including adjusting for optimized expenses curve, redrawing the net diagram and redefine total costs. It is also shown that the interests´ mechanism is the solid foundation in the process of manifesting. In addition, other countermeasure and safeguard measure were provided.
Keywords
knowledge management; optimisation; organisational aspects; subcontracting; enterprise knowledge management; institutional innovations; knowledge transfer; subcontractors; tacit knowledge; time-cost optimization; Cost function; Engineering drawings; Information technology; Knowledge management; Knowledge transfer; Optimization methods; Project management; Solids; Subcontracting; Technological innovation; knowledge exploitation; knowledge transfer; time-cost optimization;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Sciences and Convergence Information Technology, 2009. ICCIT '09. Fourth International Conference on
Conference_Location
Seoul
Print_ISBN
978-1-4244-5244-6
Electronic_ISBN
978-0-7695-3896-9
Type
conf
DOI
10.1109/ICCIT.2009.221
Filename
5368485
Link To Document