• DocumentCode
    2900703
  • Title

    Exploitation on the Knowledge Transfer of the Time-Cost Optimization

  • Author

    Wan, Lijun ; Wang, Yang

  • Author_Institution
    Harbin Normal Univ., Harbin, China
  • fYear
    2009
  • fDate
    24-26 Nov. 2009
  • Firstpage
    1335
  • Lastpage
    1338
  • Abstract
    The converting of tacit knowledge is the key of enterprise knowledge management. It facilitates the knowledge transferring between the contractor and subcontractors. Based on the difficulties in the process of knowledge transfer, this paper has focused on the manifesting the implicit knowledge by using the comparisons method. This paper emphatically introduces a series of institutional innovations including adjusting for optimized expenses curve, redrawing the net diagram and redefine total costs. It is also shown that the interests´ mechanism is the solid foundation in the process of manifesting. In addition, other countermeasure and safeguard measure were provided.
  • Keywords
    knowledge management; optimisation; organisational aspects; subcontracting; enterprise knowledge management; institutional innovations; knowledge transfer; subcontractors; tacit knowledge; time-cost optimization; Cost function; Engineering drawings; Information technology; Knowledge management; Knowledge transfer; Optimization methods; Project management; Solids; Subcontracting; Technological innovation; knowledge exploitation; knowledge transfer; time-cost optimization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Sciences and Convergence Information Technology, 2009. ICCIT '09. Fourth International Conference on
  • Conference_Location
    Seoul
  • Print_ISBN
    978-1-4244-5244-6
  • Electronic_ISBN
    978-0-7695-3896-9
  • Type

    conf

  • DOI
    10.1109/ICCIT.2009.221
  • Filename
    5368485