• DocumentCode
    2922144
  • Title

    Scheduling for Backend Manufacturing with SPTB Heuristic

  • Author

    Mohile, M.G.

  • Author_Institution
    Qimonda NA Corp., Sandston
  • fYear
    2007
  • fDate
    11-12 June 2007
  • Firstpage
    377
  • Lastpage
    383
  • Abstract
    In this paper, we address a mixed-model flow shop scheduling problem that is encountered in the Backend of a semiconductor fabrication facility. The problem is to determine both the production batch sizes of different products (models) and the sequence in which to release them for processing in the Backend facility so as to minimize average cycle time.
  • Keywords
    integrated circuit manufacture; scheduling; SPTB heuristic; backend manufacturing; mixed-model flow shop scheduling problem; semiconductor fabrication facility; Fabrication; Job shop scheduling; Manufacturing industries; Production facilities; Pulp manufacturing; Semiconductor device manufacture; Systems engineering and theory; Textile industry; Time measurement; Virtual manufacturing; engineering; manufacturing; manufacturing planning; manufacturing scheduling; modeling; optimization methods; production management; scheduling; systems engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference, 2007. ASMC 2007. IEEE/SEMI
  • Conference_Location
    Stresa
  • Print_ISBN
    1-4244-0652-8
  • Electronic_ISBN
    1-4244-0653-6
  • Type

    conf

  • DOI
    10.1109/ASMC.2007.375067
  • Filename
    4259233