DocumentCode
2922503
Title
Research on Risk Degree of Project Duration in U-PERT Network
Author
Ma, Lihua
Author_Institution
Sch. of Econ. & Manage., Hebei Univ. of Eng., Handan, China
Volume
4
fYear
2009
fDate
26-27 Dec. 2009
Firstpage
6
Lastpage
9
Abstract
When the computation of project duration, the unascertained factor of project duration is leave out in traditional PERT network. And the computing result is a determine value. In this paper, the unascertained number algorithm is introduced in order to discuss the uncertainty in project network. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained algorithm is introduced, and the unascertained number of the project duration in the network is determined by using this method. Thirdly, both the finish credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network-planning. Forthly, the risk degree of project duration in U-PERT network is delimited. Finally, the scientific of risk degree of project duration in the U-PERT is proved by a case study.
Keywords
PERT; algorithm theory; number theory; U-PERT network; network planning; project duration; project network; risk degree; unascertained number algorithm; Computer network management; Computer networks; Conference management; Engineering management; Industrial engineering; Information management; Innovation management; Project management; Risk management; Uncertainty; PERT; project duration risk; project management; risk degree; the unascertained number algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering, 2009 International Conference on
Conference_Location
Xi´an
Print_ISBN
978-0-7695-3876-1
Type
conf
DOI
10.1109/ICIII.2009.463
Filename
5369720