  • Title

    Investigation on the Capacity Expansion Method of Current 110kV Transmission Lines and Analysis on the Economic Benefit

  • Author

    Chen Jiang ; Chen Jin ; Dai Bin ; Guo Peng

  • Author_Institution
    Neijiang Bur., Sichuang Electr. Power Co., Neijiang, China
  • fYear
    2011
  • fDate
    25-28 March 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Nowadays the transmission capacity of the transmission line can not keep up with the increase of the increasing electricity demand in most cities in China. Hence in the paper the improvement on the current 110kV transmission lines in most cities in China is investigated. Firstly the possibility for using different new technique to reform the current 110kV transmission lines is investigated according to the safety rules. Then the economy cost and economic benefit for the reform of the 110kV transmission line is analyzed according to the economic evaluation system presented in the paper. Finally according to the economy cost and economic benefit, the choosing of the new technique is concluded, which offers the reference in the reform of current 110kV transmission lines in most large cities.
  • Keywords
    power transmission economics; power transmission lines; power transmission planning; capacity expansion method; economic benefit; economy cost; safety rules; transmission capacity; transmission lines; voltage 110 kV; Conductors; Economics; Heating; Poles and towers; Power transmission lines; Transmission line measurements; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
  • Conference_Location
    Wuhan
  • ISSN
    2157-4839
  • Print_ISBN
    978-1-4244-6253-7
  • Type

    conf

  • DOI
    10.1109/APPEEC.2011.5749109
  • Filename
    5749109