DocumentCode
2969260
Title
Operation and sizing aspects of converters for wind energy systems equipped with direct-drive, permanent magnet generators
Author
Gerlando, Antonino Di ; Foglia, Giovanni Maria ; Perini, Roberto ; Ubaldini, Mario
Author_Institution
Dept. of Electr. Eng., Politec. di Milano, Milano
fYear
2008
fDate
6-9 Sept. 2008
Firstpage
1
Lastpage
6
Abstract
Some converter configurations for wind energy systems are proposed. The conversion structures include capacitor loaded diode bridges directly feeding a grid side inverter. Because of the great variation of the PM generator voltage, due to the wide speed range, a winding commutation is adopted between parallel and series connection, at low speeds. Various features are analyzed, concerning converter sizing and operation aspects. Comparative remarks are made among the different conversion solutions.
Keywords
electric drives; invertors; permanent magnet generators; power capacitors; power convertors; wind power plants; capacitor loaded diode bridges; converter configurations; converter sizing; direct-drive; grid side inverter; permanent magnet generators; wide speed range; wind energy systems; winding commutation; Bridge circuits; Capacitors; Commutation; Diodes; Permanent magnets; Pulse width modulation inverters; Thyristors; Voltage; Wind energy; Wind energy generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Machines, 2008. ICEM 2008. 18th International Conference on
Conference_Location
Vilamoura
Print_ISBN
978-1-4244-1735-3
Electronic_ISBN
978-1-4244-1736-0
Type
conf
DOI
10.1109/ICELMACH.2008.4800021
Filename
4800021
Link To Document