DocumentCode
2973541
Title
An industrial application of resource constrained scheduling for quick changeover
Author
Sousa, R.M. ; Lima, R.M. ; Carvalho, J.D. ; Alves, A.C.
Author_Institution
Dept. of Production & Syst., Univ. of Minho, Guimaraes, Portugal
fYear
2009
fDate
8-11 Dec. 2009
Firstpage
189
Lastpage
193
Abstract
This paper describes the improvement of the quick changeover process of a painting line in a wooden frames factory. The well-known SMED technique (single minute exchange of die) was applied. However the characteristics of the setup operations (those characteristics also occur in other industrial changeover scenarios) have revealed the possibility of advantageous utilization of resource constrained project scheduling methods. The application of one of these methods represents an innovative contribution to the quick changeover area, allowing (when applicable) the scheduling of the involved setup operations, considering their duration, precedence relations and resources´ need, in order to achieve a reduced setup time.
Keywords
constraint theory; painting; project management; resource allocation; scheduling; wood processing; industrial application; painting line; quick changeover process; resource constrained project scheduling methods; resource constrained scheduling; single minute exchange of die technique; wooden frames factory; Assembly; Industrial relations; Job shop scheduling; Mass production; Painting; Production facilities; Production systems; Scheduling algorithm; Time factors; Wood industry; Brooks´ algorithm; SMED; quick changeover; resource constrained scheduling; setup time;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-4869-2
Electronic_ISBN
978-1-4244-4870-8
Type
conf
DOI
10.1109/IEEM.2009.5373391
Filename
5373391
Link To Document