• DocumentCode
    2982656
  • Title

    Decomposition procedures for global scheduling of complex job shops

  • Author

    Uzsoy, Reha ; Wang, Cheng-Shuo

  • Author_Institution
    Sch. of Ind. Eng., Purdue Univ., West Lafayette, IN, USA
  • fYear
    1997
  • fDate
    13-15 Oct 1997
  • Firstpage
    425
  • Lastpage
    429
  • Abstract
    We describe a prototype decomposition procedure which uses global information on shop status to develop improved schedules for wafer fabrication facilities. The system studied contains reentrant product flows, multiple products and both unit capacity and batch machines. Preliminary experiments show that the decomposition procedure yields significantly better schedules in reasonable CPU times
  • Keywords
    integrated circuit manufacture; production control; batch machines; decomposition; global scheduling; job shop; multiple products; reentrant product flows; unit capacity machines; wafer fabrication facility; Central Processing Unit; Dispatching; Fabrication; Industrial engineering; Integrated circuit yield; Job shop scheduling; Power engineering computing; Processor scheduling; Prototypes; Very large scale integration;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electronics Manufacturing Technology Symposium, 1997., Twenty-First IEEE/CPMT International
  • Conference_Location
    Austin, TX
  • ISSN
    1089-8190
  • Print_ISBN
    0-7803-3929-0
  • Type

    conf

  • DOI
    10.1109/IEMT.1997.626955
  • Filename
    626955