• DocumentCode
    2987760
  • Title

    Research on the Black Start Field Test of Shandong Power Grid Based on PDCA Cycle

  • Author

    Wang, Hongtao ; Liu, Yutian

  • Author_Institution
    Sch. of Electr. Eng., Shandong Univ., Jinan, China
  • fYear
    2010
  • fDate
    25-27 June 2010
  • Firstpage
    4144
  • Lastpage
    4148
  • Abstract
    Due to the lack of effective mechanism of black start experiment with continuous improvement in power system, the black start experiment management of PDCA mode is proposed according to the risk management mechanism, accident priority control and continuous improvement implementation principles. Shandong power grid black start experiment is implemented successfully with the standardization management. In the Planning stage during implementation of PDCA cycle management, three risk factors including abnormal parameters of the pumped-storage unit with low load, DC power shortage for breaks and issues of synchronism parallel operation are early detected and eliminated through rectification with several phases. In the Doing stage, test is implemented with four steps including adjustment of operation mode, shutdown of units, black start test and restoration of subsystem. Time is controlled accurately during test procedure. In the Checking stage, the black start ability of pumped-storage unit and large thermal power unit is analyzed with recording data of test. Test objectives are fully verified. In the Action stage, prior schemes of black start are revised. Test plan and dispatching operation are developed for the next cycle. Following the PDCA pattern, the high-risk large-cost experiment involving wide scopes realizes the closed-loop management with feedforward control, concurrent control and feedback control. It effectively guarantees the smooth implementation of the experiment. Moreover, the continuous improvement action promotes black start capabilities to be more in line with actual requirements.
  • Keywords
    closed loop systems; feedforward; power generation control; power system management; power system restoration; pumped-storage power stations; risk management; DC power shortage; PDCA cycle; accident priority control; action stage; black start experiment management; black start field test; checking stage; closed-loop management; concurrent control; doing stage; feedback control; feedforward control; planning stage; pumped-storage unit; risk management; subsystem restoration; Accidents; Generators; Power generation; Power grids; Security; Synchronization; PDCA cycle; black start; emergency management; power system restoration;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical and Control Engineering (ICECE), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-6880-5
  • Type

    conf

  • DOI
    10.1109/iCECE.2010.1006
  • Filename
    5630265