• DocumentCode
    3011270
  • Title

    The formula: world class manufacturing for hybrid thin-film component production

  • Author

    Berg, R. ; Smith, D.

  • fYear
    1992
  • fDate
    15-16 Jun 1992
  • Firstpage
    53
  • Lastpage
    60
  • Abstract
    In less than one year, the hybrid thin-film component (HTFC) production operation at Avantek transformed itself into a showcase for successful world-class manufacturing (WCM). Production cycle time was reduced by 60%, work-in-progress inventory was reduced by 92%, and overall process yields were improved by over 15%. WCM for this HTFC operation included the application of a number of productivity concepts. The proper mix of just-in-time (JIT), total quality management (TQM), and employee involvement concepts has transformed this operation into a strategic and powerful competitive tool for Avantek. The authors discuss HTFC´s successful empowerment of employees and its development of a group teamwork approach. While the success of the team work approach intertwines with the other WCM tools, teamwork has created infectious group enthusiasm for problem solving in the TQM mode while eliminating nonvalue-added activity as required by JIT. In this environment, operators, engineers, and managers became equal contributors and a fair, open, and energetic forum for the continuous improvement process was established
  • Keywords
    hybrid integrated circuits; integrated circuit manufacture; management; thin film circuits; Avantek; JIT; TQM; competitive tool; continuous improvement process; eliminating nonvalue-added activity; employee involvement concepts; empowerment of employees; energetic forum; engineers; formula; group enthusiasm; group teamwork approach; hybrid thin-film component production; just-in-time; managers; operators; problem solving; process yields; productivity concepts; total quality management; work-in-progress inventory; world class manufacturing; Energy management; Engineering management; Environmental management; Manufacturing; Problem-solving; Production; Productivity; Teamwork; Total quality management; Transistors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Science Symposium, 1992. ISMSS 1992., IEEE/SEMI International
  • Conference_Location
    San Francisco, CA
  • Print_ISBN
    0-7803-0680-5
  • Type

    conf

  • DOI
    10.1109/ISMSS.1992.197635
  • Filename
    197635