The Xixiayuan project is a regulating reservoir in china. The concrete dam section is constructed on soft rock foundation. In this paper, we present the case study on the treatment for the soft rock foundation. The treatment includes the construction of concrete cut-off wall, reinforcement by dynamic compaction method, and installation of the stone columns. The treatment was justified by the field instruments installed in the foundation. The measured data show that the treatment can reduce significantly the settlement at the foundation. Moreover, layered settlement was employed in the analysis. The results demonstrate that very small total and differential settlement occurred in the foundation. The analysis illustrate the success of the treatment for the soft rock dam foundation, and useful for gaining experience for future designs and analysis.
Keywords
building materials; concrete; dams; foundations; reservoirs; rocks; China; Xixiayuan project; concrete cutoff wall; concrete dam section; differential settlement; dynamic compaction method; field instruments; layered settlement; regulating reservoir; settlement analysis; soft rock dam foundation; stone columns; Concrete; Instruments; Monitoring; Rivers; Rocks; Stability analysis; composite foundation; layered settlement; safety monitoring; soft rock;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6001731
Filename
6001731
Link To Document