DocumentCode
3033450
Title
Simulation in manufacturing planning of buildings
Author
Berner, Fritz ; Kochkine, Vitali ; Habenicht, Ilka ; Spieckermann, Sven ; Vath, Cornelius
Author_Institution
Inst. of Constr. Manage., Univ. of Stuttgart, Stuttgart, Germany
fYear
2013
fDate
8-11 Dec. 2013
Firstpage
3306
Lastpage
3317
Abstract
Optimal planning of construction projects requires an efficient allocation of available resources. Labor, material, equipment are to be planned, coordinated and quickly adapted to varying conditions. Frequent (design) changes during the construction period, diversity of trades and the high complexity of interacting processes in building manufacturing require innovative ways to support process-influencing decisions - a tool which allows testing interventions and adjustments in the manufacturing process, including individual sub-processes with the best possible efficiency. In this context, the discrete-event simulation comes into place. A research group simulated the manufacturing process of a hotel project in all details in order to examine applicability of simulation in the construction industry and to scrutinize and adjust it according to the construction specifics. The approach taken, the challenges encountered and insights gained will be presented in this article.
Keywords
buildings (structures); construction industry; discrete event simulation; project management; resource allocation; strategic planning; buildings; construction industry; construction project optimal planning; discrete event simulation; equipments; hotel project; labor; manufacturing planning; materials; resource allocation; Buildings; Context modeling; Logistics; Manufacturing; Planning; Resource management;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), 2013 Winter
Conference_Location
Washington, DC
Print_ISBN
978-1-4799-2077-8
Type
conf
DOI
10.1109/WSC.2013.6721695
Filename
6721695
Link To Document