DocumentCode
3046259
Title
Utility experience with gas turbine testing and modeling
Author
Hajagos, L.M. ; Bérubé, G.R.
Author_Institution
Kestrel Power Eng., Toronto, Ont., Canada
Volume
2
fYear
2001
fDate
2001
Firstpage
671
Abstract
This paper presents experience with testing of gas turbine plants for NERC and WSCC compliance. Testing has been performed on older analog-electronic and new digital-electronic units. The level of detail used in modeling and model availability in simulation programs are ongoing issues. Temperature limits and outer-loop controls such as PF/VAr controls and load sharing have been seen to dominate plant performance
Keywords
gas turbines; load (electric); power factor correction; power generation control; reactive power control; temperature control; testing; NERC compliance; PF/VAr controls; WSCC compliance; analog-electronic units; digital-electronic units; gas turbine modeling; gas turbine testing; load sharing; outer-loop controls; plant performance; simulation programs; temperature limits; utility experience; Control systems; Delay effects; Electronic equipment testing; Fuels; Monitoring; Performance evaluation; Temperature control; Turbines; Valves; Velocity measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Winter Meeting, 2001. IEEE
Conference_Location
Columbus, OH
Print_ISBN
0-7803-6672-7
Type
conf
DOI
10.1109/PESW.2001.916934
Filename
916934
Link To Document