• DocumentCode
    3063066
  • Title

    Design and Implementation of Bus Crew Scheduling System Using Integrated Case-based and Rule-based Reasoning

  • Author

    Liu, Tao ; Ma, Jihui ; Guan, Wei ; Song, Yue ; Fu, Pengwei

  • Author_Institution
    MOE Key Lab. for Urban Transp. Complex Syst. Theor. & Technol., Beijing Jiaotong Univ., Beijing, China
  • fYear
    2012
  • fDate
    23-26 June 2012
  • Firstpage
    475
  • Lastpage
    479
  • Abstract
    The bus crew scheduling problem (BCSP) is to assign drivers and conductors to daily crew duties that cover a set of schedules for buses of a public bus company during a period of time, e.g., a week. By combining case-based reasoning (CBR) and rule-based reasoning (RBR), this paper introduces the design and implementation of a bus crew scheduling system (BCSS). The current system works like this. Firstly, an inference mechanism integrating CBR and RBR is designed to obtain near-optimal solutions. Secondly, based on these near-optimal solutions, a genetic algorithm is developed to produce better solutions. The practical applications show that the system is effective.
  • Keywords
    case-based reasoning; genetic algorithms; knowledge based systems; road vehicles; scheduling; traffic engineering computing; BCSP; BCSS; CBR; RBR; bus crew scheduling problem; bus crew scheduling system; case-based reasoning; crew duties; genetic algorithm; inference mechanism; public bus company; rule-based reasoning; Cognition; Companies; Conductors; Databases; Genetic algorithms; Processor scheduling; Vehicles; bus crew scheduling problem; case-based reasoning; genetic algorithm; rule-based reasoning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Sciences and Optimization (CSO), 2012 Fifth International Joint Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4673-1365-0
  • Type

    conf

  • DOI
    10.1109/CSO.2012.110
  • Filename
    6274770