DocumentCode
306860
Title
Single machine scheduling with deadlines, release and due dates
Author
Gordon, Valery ; Potapneva, Elena ; Werner, Frank
Author_Institution
Inst. of Eng. Cybern., Acad. of Sci., Minsk, Byelorussia
Volume
1
fYear
1996
fDate
18-21 Nov 1996
Firstpage
22
Abstract
We consider a single machine preemptive scheduling problem to minimize the weighted number of late jobs. There are given n jobs and for each job we have a release date, a processing time and a due date. It is assumed that certain specified jobs have to be completed on time. The due dates for these jobs are considered as deadlines, while for the other jobs due dates may be violated. For the case of similarly ordered release and due dates (when there is no advantage to preemption) as well as for the case of embedded release and due date intervals and preemption allowed, we transform the initial problem into a reduced problem, where all jobs with deadlines are eliminated. It gives an opportunity to propose O(n log n) algorithms for some special cases of the considered problems
Keywords
computational complexity; minimisation; production control; O(n log n) algorithms; deadlines; due dates; late jobs; release dates; single machine preemptive scheduling problem; Cybernetics; Job production systems; Polynomials; Project management; Single machine scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technologies and Factory Automation, 1996. EFTA '96. Proceedings., 1996 IEEE Conference on
Conference_Location
Kauai, HI
Print_ISBN
0-7803-3685-2
Type
conf
DOI
10.1109/ETFA.1996.573250
Filename
573250
Link To Document