• DocumentCode
    306860
  • Title

    Single machine scheduling with deadlines, release and due dates

  • Author

    Gordon, Valery ; Potapneva, Elena ; Werner, Frank

  • Author_Institution
    Inst. of Eng. Cybern., Acad. of Sci., Minsk, Byelorussia
  • Volume
    1
  • fYear
    1996
  • fDate
    18-21 Nov 1996
  • Firstpage
    22
  • Abstract
    We consider a single machine preemptive scheduling problem to minimize the weighted number of late jobs. There are given n jobs and for each job we have a release date, a processing time and a due date. It is assumed that certain specified jobs have to be completed on time. The due dates for these jobs are considered as deadlines, while for the other jobs due dates may be violated. For the case of similarly ordered release and due dates (when there is no advantage to preemption) as well as for the case of embedded release and due date intervals and preemption allowed, we transform the initial problem into a reduced problem, where all jobs with deadlines are eliminated. It gives an opportunity to propose O(n log n) algorithms for some special cases of the considered problems
  • Keywords
    computational complexity; minimisation; production control; O(n log n) algorithms; deadlines; due dates; late jobs; release dates; single machine preemptive scheduling problem; Cybernetics; Job production systems; Polynomials; Project management; Single machine scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 1996. EFTA '96. Proceedings., 1996 IEEE Conference on
  • Conference_Location
    Kauai, HI
  • Print_ISBN
    0-7803-3685-2
  • Type

    conf

  • DOI
    10.1109/ETFA.1996.573250
  • Filename
    573250