DocumentCode
3094733
Title
A Total Solution for Power Grid Monitoring and Controlling -- WAMAP
Author
Hong, Xianping
Author_Institution
East China Electr. Consulting Co. Ltd., Shanghai
fYear
2007
fDate
24-28 June 2007
Firstpage
1
Lastpage
6
Abstract
A large scale three-phase project, called Wide Area Monitoring Analysis Protection and control system (WAMAP), was developed and launched by East China Grid Company (ECG) to prevent power blackout and to monitor and control the dynamics of power grids in East China. The differences between WAMAP and Wide Area Monitoring System (WAMS) are examined in details. A unique 3-state data acquisition platform and dynamic database design method have been implemented to monitor and control the power grid robustly.
Keywords
power grids; power system control; power system measurement; power system protection; power system reliability; East China Grid Company; data acquisition platform; dynamic database design; large scale three-phase project; power blackout prevention; power grid control; power grid monitoring; wide area monitoring analysis protection; Control system analysis; Control systems; Data acquisition; Electrocardiography; Large-scale systems; Monitoring; Power grids; Power system dynamics; Power system protection; Wide area measurements; Power grid; Wide Area Monitoring Analysis; blackout; distribution; power grid safety; power outage prevention; power transmission;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2007. IEEE
Conference_Location
Tampa, FL
ISSN
1932-5517
Print_ISBN
1-4244-1296-X
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2007.385590
Filename
4275472
Link To Document