DocumentCode
3096374
Title
Planning Issues for FACTS
Author
Henderson, M. ; Ramey, D.
fYear
2007
fDate
24-28 June 2007
Firstpage
1
Lastpage
3
Abstract
Planning flexible alternating current transmission systems (FACTS) presents special technical and commercial challenges, especially in systems with deregulated markets. This paper describes some of the issues that must be addressed to successfully plan and operate an FACTS facility.
Keywords
flexible AC transmission systems; power markets; power transmission economics; power transmission planning; FACTS; deregulated markets; flexible alternating current transmission systems; transmission planning; Economic forecasting; Environmental economics; Load flow; Power generation economics; Power system economics; Power system planning; Power system reliability; Stress; Uncertainty; Voltage control; Control; FACTS - Deregulation; Power System Planning; Voltage Support;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2007. IEEE
Conference_Location
Tampa, FL
ISSN
1932-5517
Print_ISBN
1-4244-1296-X
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2007.385792
Filename
4275558
Link To Document