• DocumentCode
    3105538
  • Title

    Scheduling on the parallel machines with mould constraint

  • Author

    Xianzhang, Chen ; Chengyao, Wang

  • Author_Institution
    Coll. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
  • fYear
    1999
  • fDate
    36373
  • Firstpage
    1167
  • Lastpage
    1170
  • Abstract
    This paper addresses the problem of scheduling n grouped jobs on m identical parallel machines with objective of minimizing the sum tardiness, subject to the constraints that each model number is only one and has different matching with each machine. A heuristic approach based on list scheduling is presented. Some conditions are presented which can break the sequence of assigning jobs. The results show that it can get a satisfactory solution
  • Keywords
    heuristic programming; minimisation; moulding; production control; grouped job scheduling; heuristic approach; job assignment; list scheduling; mould constraint; parallel machines; tardiness sum minimization; Educational institutions; Globalization; Group technology; Heuristic algorithms; Information science; Job shop scheduling; Large-scale systems; Parallel machines; Production facilities; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    SICE Annual, 1999. 38th Annual Conference Proceedings of the
  • Conference_Location
    Morioka
  • Print_ISBN
    4-907764-13-8
  • Type

    conf

  • DOI
    10.1109/SICE.1999.788717
  • Filename
    788717