DocumentCode
3106913
Title
Study on the Calculation Method of Time Parameters in Grey Network Planning
Author
Meng Wen-Qing ; Zhang Ya-Peng ; Zhang Yan-Jie
Author_Institution
Sch. of Civil Eng., Hebei Univ. of Eng., Handan, China
fYear
2009
fDate
13-14 Dec. 2009
Firstpage
432
Lastpage
435
Abstract
In grey network planning, the parameters of duration are expressed as interval grey numbers. When the time parameters were calculated according to grey number operational laws, grey degree of the results is expanded unnecessarily and sometimes the lower bounds are negative. So, the time parameters of grey network planning lost the original meaning. The present paper studies on the time parameters of grey network planning further by adjusting the time parameters according to their practical meaning. This method can solve the problems above. It enhances the flexibility and applicability in decision-making and has important significance for project managers.
Keywords
grey systems; production planning; project management; decision-making; grey network planning; grey number operational law; interval grey number; time parameter; Civil engineering; Conference management; Decision making; Electronic mail; Engineering management; Information management; Information technology; Project management; Technology management; Technology planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Future Information Technology and Management Engineering, 2009. FITME '09. Second International Conference on
Conference_Location
Sanya
Print_ISBN
978-1-4244-5339-9
Type
conf
DOI
10.1109/FITME.2009.114
Filename
5381020
Link To Document