An approach to lowering cost of satellite development
Author
Geissler, David
Author_Institution
Fairchild Space Co., Germantown, MD, USA
fYear
1990
fDate
30 Sep-3 Oct 1990
Firstpage
701
Abstract
An approach to lowering development costs using resources available to aerospace companies is examined. It makes use of the WBS (work breakdown structure) data capturing model, a tool to capture, analyze, and report data for satellite projects. It is based on the work breakdown structure, which is used by project managers throughout the satellite life cycle to predict, manage, and report project costs. The WBS data capturing model provides the company with a method of saving costs by efficiently perpetuating the methods and designs using a structure that is familiar. It does not burden programs beyond normal configuration and data management required virtually all programs
Keywords
aerospace industry; artificial satellites; economics; aerospace companies; cost reduction; data capturing model; data management; project costs; satellite development cost; satellite life cycle; satellite projects; work breakdown structure; Costs; Data handling; Ground support; Guidelines; On the job training; Project management; Satellites; Space technology; Space vehicles; Telemetry;
fLanguage
English
Publisher
ieee
Conference_Titel
Military Communications Conference, 1990. MILCOM '90, Conference Record, A New Era. 1990 IEEE
Conference_Location
Monterey, CA
Type
conf
DOI
10.1109/MILCOM.1990.117504
Filename
117504
Link To Document