    An approach to lowering cost of satellite development

  • Author

    Geissler, David

  • Author_Institution
    Fairchild Space Co., Germantown, MD, USA
  • fYear
    1990
  • fDate
    30 Sep-3 Oct 1990
  • Firstpage
    701
  • Abstract
    An approach to lowering development costs using resources available to aerospace companies is examined. It makes use of the WBS (work breakdown structure) data capturing model, a tool to capture, analyze, and report data for satellite projects. It is based on the work breakdown structure, which is used by project managers throughout the satellite life cycle to predict, manage, and report project costs. The WBS data capturing model provides the company with a method of saving costs by efficiently perpetuating the methods and designs using a structure that is familiar. It does not burden programs beyond normal configuration and data management required virtually all programs
  • Keywords
    aerospace industry; artificial satellites; economics; aerospace companies; cost reduction; data capturing model; data management; project costs; satellite development cost; satellite life cycle; satellite projects; work breakdown structure; Costs; Data handling; Ground support; Guidelines; On the job training; Project management; Satellites; Space technology; Space vehicles; Telemetry;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Military Communications Conference, 1990. MILCOM '90, Conference Record, A New Era. 1990 IEEE
  • Conference_Location
    Monterey, CA
  • Type

    conf

  • DOI
    10.1109/MILCOM.1990.117504
  • Filename
    117504