• DocumentCode
    3151072
  • Title

    Hybrid Heuristic for Total Flowtime Minimization in No-wait Flow Shops

  • Author

    Zhu, Xia ; Li, Xiaoping ; Wang, Qian

  • Author_Institution
    Southeast Univ., Nanjing
  • fYear
    2007
  • fDate
    26-28 April 2007
  • Firstpage
    1050
  • Lastpage
    1054
  • Abstract
    In this paper, no-wait flow shop scheduling problem with total flowtime minimization is considered. A hybrid heuristic is proposed, which is based on PHI (p) (presented by Aldowaisan and Allahverdi, OMEGA, 2004). A composite algorithm is adopted to generate the initial seed. Job insertion in PHI (p) is replaced with an existing constructive heuristic. Experimental results show that the proposal outperforms PHI (p), especially for large scale instances.
  • Keywords
    computational complexity; flow shop scheduling; heuristic programming; minimisation; no-wait flow shops scheduling problem; time complexity; total flowtime minimization; Chemical technology; Collaborative work; Computer networks; Design engineering; Job shop scheduling; Laboratories; Large-scale systems; Manufacturing; Processor scheduling; Proposals; flow-shop; heuristic scheduling; no-wait; total flowtime;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Supported Cooperative Work in Design, 2007. CSCWD 2007. 11th International Conference on
  • Conference_Location
    Melbourne, Vic.
  • Print_ISBN
    1-4244-0963-2
  • Electronic_ISBN
    1-4244-0963-2
  • Type

    conf

  • DOI
    10.1109/CSCWD.2007.4281584
  • Filename
    4281584