    Scheduling a batch processing facility

  • Author

    Hoitomt, Debra J. ; Luh, Peter B.

  • Author_Institution
    Pratt & Whitney, East Hartford, CT, USA
  • fYear
    1992
  • fDate
    12-14 May 1992
  • Firstpage
    1167
  • Abstract
    A method for batching jobs within a class in advance of sequencing is presented. It is shown that under certain simplifying assumptions, optimal batch composition can be obtained independent of the sequencing problem. This composition is determined by assigning parts to batches according to an earliest due date (EDD) rule. An efficient methodology for sequencing the batches based on the Lagrangian relaxation technique is presented. The solution to the Lagrangian relaxation dual problem is a lower bound on the cost of the optimal schedule. If the assumptions are relaxed, the EDD rule becomes a heuristic for solving the batch composition problem, and the same batch sequencing algorithm can be used to obtain a schedule. In that case, the dual cost is a lower bound on the cost of all possible sequences with the same batch composition. Preliminary results show that good schedules can be efficiently obtained
  • Keywords
    batch processing (industrial); optimisation; production control; relaxation theory; Lagrangian relaxation; batch composition; batch processing; earliest due date; job sequencing; lower bound; optimisation; production control; scheduling; Cost function; Educational programs; Educational technology; Job shop scheduling; Lagrangian functions; Lifting equipment; Optimal scheduling; Ovens; Scheduling algorithm; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on
  • Conference_Location
    Nice
  • Print_ISBN
    0-8186-2720-4
  • Type

    conf

  • DOI
    10.1109/ROBOT.1992.220091
  • Filename
    220091