DocumentCode
3197962
Title
Optimal production control in pull flow lines with multiple part types: a summary
Author
Yang, Jun ; Yan, Houmin ; Sethi, Suresh P.
Author_Institution
Dept. of Syst. Eng., Chinese Univ. of Hong Kong, Shatin, Hong Kong
Volume
4
fYear
1996
fDate
11-13 Dec 1996
Firstpage
3847
Abstract
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and its computational complexity
Keywords
computational complexity; minimisation; optimal control; production control; backlog cost minimization; bottleneck; computational complexity; multiple part types; optimal production control problem; pull flow lines; total inventory minimization; Computational complexity; Costs; Dynamic scheduling; Electric breakdown; Fluid dynamics; Linear programming; Production control; Production systems; Steady-state; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 1996., Proceedings of the 35th IEEE Conference on
Conference_Location
Kobe
ISSN
0191-2216
Print_ISBN
0-7803-3590-2
Type
conf
DOI
10.1109/CDC.1996.577259
Filename
577259
Link To Document