• DocumentCode
    3197962
  • Title

    Optimal production control in pull flow lines with multiple part types: a summary

  • Author

    Yang, Jun ; Yan, Houmin ; Sethi, Suresh P.

  • Author_Institution
    Dept. of Syst. Eng., Chinese Univ. of Hong Kong, Shatin, Hong Kong
  • Volume
    4
  • fYear
    1996
  • fDate
    11-13 Dec 1996
  • Firstpage
    3847
  • Abstract
    The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and its computational complexity
  • Keywords
    computational complexity; minimisation; optimal control; production control; backlog cost minimization; bottleneck; computational complexity; multiple part types; optimal production control problem; pull flow lines; total inventory minimization; Computational complexity; Costs; Dynamic scheduling; Electric breakdown; Fluid dynamics; Linear programming; Production control; Production systems; Steady-state; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 1996., Proceedings of the 35th IEEE Conference on
  • Conference_Location
    Kobe
  • ISSN
    0191-2216
  • Print_ISBN
    0-7803-3590-2
  • Type

    conf

  • DOI
    10.1109/CDC.1996.577259
  • Filename
    577259