• DocumentCode
    3211381
  • Title

    An Alignment of J-PARC Linac

  • Author

    Morishita, T. ; Ao, H. ; Ito, T. ; Ueno, A. ; Hasegawa, K. ; Ikegami, M. ; Kubota, C. ; Naito, F. ; Takasaki, E. ; Tanaka, H. ; Yoshino, K.

  • Author_Institution
    JAERI, Tokai, Ibaraki 319-1195, Japan, morishita@linac.tokai.jaeri.go.jp
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2851
  • Lastpage
    2853
  • Abstract
    J-PARC linear accelerator components are now being installed in the accelerator tunnel, whose total length is more than 400 m including the beam transport line to 3GeV synchrotron. A precise alignment of accelerator components is essential for high quality beam acceleration. In this paper, planned alignment schemes for the installation of linac components and watching the long term motion of the building are described. Markings are placed on the floor, which act as a reference for the initial alignment at the installation. For a straight line alignment, the wire position sensor is placed on the offset position with respect to the beam center by a target holder. The hydrostatic levering system is used for watching the floor elevation over the long period.
  • Keywords
    Floors; High level synthesis; Indium tin oxide; Klystrons; Linear accelerators; Linear particle accelerator; Monitoring; Particle beams; Synchrotrons; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591291
  • Filename
    1591291