• DocumentCode
    3215960
  • Title

    Assessing the value of distribution infrastructure replacement

  • Author

    Roldan, Zoilo S. ; Chien, Shan Heng ; Lee, Roger J.

  • Author_Institution
    T&D Div., Asset Manage. & Syst. Reliability Group, Southern California Edison Co., Santa Ana, CA
  • fYear
    2009
  • fDate
    15-18 March 2009
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    Many utilities have defaulted to a policy of run-to-failure as their strategy for managing distribution assets by postponing initiation of a program of preemptive infrastructure replacement. What has caused utilities to do what they instinctively believe is short-sighted likely includes their inability to clearly predict such a program´s return on investment. Southern California Edison (SCE) has developed a method of performing long-term probabilistic forecasts of the reliability of its distribution system as a function of investments in preemptive infrastructure replacement, i.e., a method to calculate the payback.
  • Keywords
    power distribution reliability; distribution assets; distribution infrastructure replacement; distribution system reliability; long-term probabilistic forecasts; Asset management; Cable insulation; Communication cables; Data engineering; Databases; Design engineering; Investments; Power cable insulation; Power cables; Reliability engineering; failure probability; probabilistic forecast; reliability management; reliability modeling; risk analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES
  • Conference_Location
    Seattle, WA
  • Print_ISBN
    978-1-4244-3810-5
  • Electronic_ISBN
    978-1-4244-3811-2
  • Type

    conf

  • DOI
    10.1109/PSCE.2009.4840059
  • Filename
    4840059