• DocumentCode
    322618
  • Title

    A new solution of 150 kV overhead compact line

  • Author

    Cecchetti, E. ; Gubiotti, P. ; Sartore, L. ; Tonon, R.

  • Author_Institution
    ENEL SpA, Italy
  • Volume
    3
  • fYear
    1997
  • fDate
    1997
  • Abstract
    In countries, such as Italy, characterised by the intensive use of land for various purposes (industrial, agricultural, residential), the construction of overhead lines is increasingly constrained due to the growing awareness of the population towards environmental issues and the passing of special laws for the safeguard of environmental assets. The current community approach in the field of environmental protection calls for the adoption of technical planning and decision-making processes that make it possible to assess the impact of works and constructions on the environment in advance, during the study and design phase. In order to meet these needs, ENEL is experimenting new advanced solutions to make overhead lines more compact that have been developed in relation to the actual application on the field. One of these solutions, used for the reconstruction of a line in the outskirts of Rome, is described. The solution is based on the use of poles and bored pile foundations
  • Keywords
    power overhead lines; 150 kV; ENEL; Italy; Rome; bored pile foundations; decision-making processes; environmental assets; environmental issues; environmental protection; overhead compact line; overhead line reconstruction; poles;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
  • Conference_Location
    Birmingham
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-674-1
  • Type

    conf

  • DOI
    10.1049/cp:19970530
  • Filename
    667971