• DocumentCode
    3246437
  • Title

    Time decision-making of highway reconstruction based on trigger point mechanism

  • Author

    Haiqian, Cheng ; Wen, Tian ; Qinghua, Cheng

  • Author_Institution
    Wuhan Univ. of Technol., Wuhan, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    1818
  • Lastpage
    1820
  • Abstract
    The adaptation of highway to economic development is a continuous and dynamic process, which presents a state from adaptation to inadaptation and to adaptation. The decision on the reconstruction time of highway is a significant macroscopical decision-making problem. Both on the basis of analyzing the service level of highway and the theory of trigger point mechanism, this paper constructed time decision-making model of highway reconstruction and put forward the application method of the model. In addition, taking the Shen Yi highway reconstruction project in Hubei for example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction time.
  • Keywords
    decision making; road building; Hubei; Shen Yi highway reconstruction project; economic development; highway reconstruction time; service level; time decision making model; trigger point mechanism; Analytical models; Decision making; Economics; Manuals; Roads; Vehicles; highway reconstruction; service level; time decision-making; trigger point mechanism;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5775728
  • Filename
    5775728