DocumentCode
3246437
Title
Time decision-making of highway reconstruction based on trigger point mechanism
Author
Haiqian, Cheng ; Wen, Tian ; Qinghua, Cheng
Author_Institution
Wuhan Univ. of Technol., Wuhan, China
fYear
2011
fDate
22-24 April 2011
Firstpage
1818
Lastpage
1820
Abstract
The adaptation of highway to economic development is a continuous and dynamic process, which presents a state from adaptation to inadaptation and to adaptation. The decision on the reconstruction time of highway is a significant macroscopical decision-making problem. Both on the basis of analyzing the service level of highway and the theory of trigger point mechanism, this paper constructed time decision-making model of highway reconstruction and put forward the application method of the model. In addition, taking the Shen Yi highway reconstruction project in Hubei for example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction time.
Keywords
decision making; road building; Hubei; Shen Yi highway reconstruction project; economic development; highway reconstruction time; service level; time decision making model; trigger point mechanism; Analytical models; Decision making; Economics; Manuals; Roads; Vehicles; highway reconstruction; service level; time decision-making; trigger point mechanism;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5775728
Filename
5775728
Link To Document