DocumentCode
3258966
Title
Research on the method of project configuration based on CBR
Author
Shan Miyuan ; Cui, Cai ; Bin Ren
Author_Institution
Sch. of Bus. Adm., Hunan Univ., Changsha, China
fYear
2011
fDate
8-10 Aug. 2011
Firstpage
482
Lastpage
485
Abstract
According to the request to quickly create Work Breakdown Structure in the multiproject operating environment, based on Case-Based Reasoning which reuses the resources and knowledge of design in Artificial Intelligence, this study firstly established the object-oriented representation of General Work Breakdown Structure, and described in detail about knowledge representation of General Work Breakdown Structure. Secondly, this study constructed the project configuration model based on CBR and provided a specific solution strategy about the key steps including case representation, case retrieval, case correction and case preservation when applying CBR in the project configuration. Finally, this study took a construction project for example to describe the practical application of the configuration solution strategy.
Keywords
case-based reasoning; construction industry; object-oriented methods; project management; artificial intelligence; case correction; case preservation; case representation; case retrieval; case-based reasoning; construction project; general work breakdown structure; multiproject operating environment; object-oriented representation; project configuration method; Cognition; Computer aided software engineering; Educational institutions; Electric breakdown; Feature extraction; Object oriented modeling; Object recognition; CBR; General Work Breakdown Structure; Object-oriented; WBS element; project configuration;
fLanguage
English
Publisher
ieee
Conference_Titel
Emergency Management and Management Sciences (ICEMMS), 2011 2nd IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-9665-5
Type
conf
DOI
10.1109/ICEMMS.2011.6015724
Filename
6015724
Link To Document