DocumentCode
3259066
Title
Key process and difficulty analysis of pipe sections prefabrication of immersed tunnel and research on the solving measures
Author
Shen, Qiyu ; Qiu, Feng
Author_Institution
Sch. of Civil & Transp. Eng., South China Univ. of Technol., Guangzhou, China
fYear
2011
fDate
22-24 April 2011
Firstpage
5145
Lastpage
5148
Abstract
The key process and difficulty of pipe sections prefabrication of immersed tunnel in the Zhoutouju tunneling project was analyzed firstly, including the error control of prefabricated pipe junctions in geometry size, proportioning of concrete design and production of concrete, the process of concrete construction, crack width control of concrete. Then several key technical measures, such as the organization and the management of pipe sections prefabrication, pipe dimensions control, control of unit weight of concrete, control of crack width by temperature and so on, were proposed to make sure that the quality of prefabricated pipe sections meets the requirement.
Keywords
concrete; cracks; tunnels; Zhoutouju tunneling project; concrete construction; concrete design; concrete production; crack width control; error control; geometry size; immersed tunnel; pipe sections prefabrication; prefabricated pipe junctions; Concrete; Measurement uncertainty; Presses; Process control; Temperature control; Temperature measurement; control; immersed tunnel; management; pipe prefabrication;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5776352
Filename
5776352
Link To Document