• DocumentCode
    3259066
  • Title

    Key process and difficulty analysis of pipe sections prefabrication of immersed tunnel and research on the solving measures

  • Author

    Shen, Qiyu ; Qiu, Feng

  • Author_Institution
    Sch. of Civil & Transp. Eng., South China Univ. of Technol., Guangzhou, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    5145
  • Lastpage
    5148
  • Abstract
    The key process and difficulty of pipe sections prefabrication of immersed tunnel in the Zhoutouju tunneling project was analyzed firstly, including the error control of prefabricated pipe junctions in geometry size, proportioning of concrete design and production of concrete, the process of concrete construction, crack width control of concrete. Then several key technical measures, such as the organization and the management of pipe sections prefabrication, pipe dimensions control, control of unit weight of concrete, control of crack width by temperature and so on, were proposed to make sure that the quality of prefabricated pipe sections meets the requirement.
  • Keywords
    concrete; cracks; tunnels; Zhoutouju tunneling project; concrete construction; concrete design; concrete production; crack width control; error control; geometry size; immersed tunnel; pipe sections prefabrication; prefabricated pipe junctions; Concrete; Measurement uncertainty; Presses; Process control; Temperature control; Temperature measurement; control; immersed tunnel; management; pipe prefabrication;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5776352
  • Filename
    5776352