DocumentCode
3272379
Title
Using Automated Event Handling for a Simulation-Based Process Coverage in Supply Networks
Author
Dangelmaier, W. ; Döring, Andre ; Laroque, Christoph ; Timm, Thorsten
fYear
2008
fDate
1-3 April 2008
Firstpage
158
Lastpage
162
Abstract
The project AC/DC, funded by the European Commission (contract number FP6-SST-031520), deals with new logistical concepts for planning and control of supply networks that enhance automotive manufacturing radically. To handle upcoming disturbances within the regarded supply network structure, a real-time event management system is developed in order to automatically handle occurring events in a highly reactive way based on reliable processes. The simulation-based approach of identification, classification and especially the automated evaluation of handling actions are introduced in this paper.
Keywords
Automotive engineering; Computational modeling; Computer simulation; Costs; Demand forecasting; Discrete event simulation; Manufacturing; Process planning; Production systems; Supply chains; event handling; process coverage; simluation; supply network management;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Modeling and Simulation, 2008. UKSIM 2008. Tenth International Conference on
Conference_Location
Cambridge, UK
Print_ISBN
0-7695-3114-8
Type
conf
DOI
10.1109/UKSIM.2008.57
Filename
4488924
Link To Document