• DocumentCode
    3292876
  • Title

    The GMP & ISO9001 new product planning process

  • Author

    McVay, W. Patrick

  • Author_Institution
    McVay Consulting Assoc., Doylestown, PA, USA
  • fYear
    1996
  • fDate
    4-6 Nov 1996
  • Firstpage
    247
  • Lastpage
    252
  • Abstract
    This article describes only the first steps in meeting the IS09001/EN46001 standards and FDA Quality Systems regulations. A company must consider additional control systems in order to meet the Design Control requirements listed under design input, design output, design review, design verification, design transfer, design history file and design changes. Generic planning by functional departments is a basis requirement and should be available for individuals participating in product development. In addition, company management must tackle how it will structure itself in order to create new medical products in an orderly and structured manner and provide the team leader and his team with the authority and responsibilities to plan, monitor, evaluate and document a new product
  • Keywords
    biomedical equipment; design engineering; planning; product development; FDA Quality Systems regulations; GMP; IS09001/EN46001 standards; authority; company management; design changes; design history file; design input; design output; design review; design transfer; design verification; functional departments; generic planning; new product planning process; responsibilities; team leader; Certification; Control systems; Drugs; Manufacturing; Medical control systems; Personnel; Process planning; Product design; Product safety; Standards organizations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Northcon/96
  • Conference_Location
    Seattle, WA
  • Print_ISBN
    0-7803-3277-6
  • Type

    conf

  • DOI
    10.1109/NORTHC.1996.564916
  • Filename
    564916