DocumentCode
329875
Title
Modeling for a large scale hydropower station simulator based on the object-oriented facility
Author
Changhong, Deng ; Xiangyong, Hu ; Xianshan, Li ; Chengming, Wu
Author_Institution
Wuhan Univ. of Hydraulic & Electr. Eng., China
Volume
1
fYear
1997
fDate
11-14 Nov 1997
Firstpage
156
Abstract
Because a large-scale hydroelectric power station simulator in the authors´ laboratory has a special functional requirement that all simulation be generating sets oriented, generating processes oriented and whole zone station oriented, modeling of a large scale hydropower station has other characteristics in addition to general simulator modeling characteristics. The authors have used an object-oriented methodology in modeling this large-scale hydropower station and have obtained satisfactory results in some degree. The architecture of modeling for this simulator is presented in this paper
Keywords
hydroelectric power stations; computer simulation; functional requirement; large-scale hydroelectric power station; modeling characteristics; modelling architecture; object-oriented methodology;
fLanguage
English
Publisher
iet
Conference_Titel
Advances in Power System Control, Operation and Management, 1997. APSCOM-97. Fourth International Conference on (Conf. Publ. No. 450)
Print_ISBN
0-85296-912-0
Type
conf
DOI
10.1049/cp:19971822
Filename
726861
Link To Document