• DocumentCode
    3312520
  • Title

    An Approach to Determine Spinning Reserve Requirements in a Deregulated Electricity Market

  • Author

    Porkar, S. ; Fotuhi-Firuzabad, M. ; Farad, A.A.-T. ; Porkar, B.

  • Author_Institution
    Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran
  • fYear
    2006
  • fDate
    Oct. 29 2006-Nov. 1 2006
  • Firstpage
    1341
  • Lastpage
    1344
  • Abstract
    To make the energy market reliable and transactions deliverable, transmission owners must provide required ancillary services that are critical to ensure transmission open access, and to maintain an acceptable level of power system security. Spinning reserve is one of the most important ancillary services required to maintain system reliability in case of occurring a contingency. By definition, spinning reserve is the unloaded section of synchronized generation that is able to respond immediately to serve load. Studies indicate that spinning reserve requirements have significant impacts on the energy market. A new spinning reserve market structure is proposed in this paper to best utilize the available resources to meet load and spinning reserve requirements with the transmission constraints while maintaining system security in the context of an energy market
  • Keywords
    power markets; power system reliability; power system security; deregulated electricity market; power system security; spinning reserve; system reliability; transmission constraints; Electricity supply industry; Electricity supply industry deregulation; Load forecasting; Maintenance; Power generation; Power system control; Power system reliability; Power systems; Senior members; Spinning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Systems Conference and Exposition, 2006. PSCE '06. 2006 IEEE PES
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    1-4244-0177-1
  • Electronic_ISBN
    1-4244-0178-X
  • Type

    conf

  • DOI
    10.1109/PSCE.2006.296499
  • Filename
    4075938