DocumentCode
3334608
Title
Planning for reliability
Author
Rumolo, David J. ; Fraser, George F.
Author_Institution
Resource Management Int. Inc., Phoenix, AZ, USA
fYear
1993
fDate
25-27 Apr 1993
Abstract
A discussion of the multifaceted aspects of electric distribution system reliability is provided. A discussion of the tools utilized to measure reliability is presented, and the organizational aspects of reliability performance are discussed
Keywords
distribution networks; power system planning; power system reliability; distribution system; performance; power system planning; reliability; Accidents; Frequency measurement; Humans; Maintenance; Meeting planning; Power industry; Reliability; Resource management; Storms; Substations;
fLanguage
English
Publisher
ieee
Conference_Titel
Rural Electric Power Conference, 1993. Papers Presented at the 37th Annual Conference
Conference_Location
Kansas City, MO
Print_ISBN
0-7803-0940-5
Type
conf
DOI
10.1109/REPCON.1993.239558
Filename
239558
Link To Document