• DocumentCode
    3336501
  • Title

    Interconnection service fee for generator of industrial and arc Furnace customers

  • Author

    Marbun, Musa Partahi ; Sinisuka, N.I.

  • Author_Institution
    Magister of Electr. Technol. & Bus., Inst. Teknol. Bandung, Bandung, Indonesia
  • fYear
    2011
  • fDate
    17-19 July 2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This thesis presents the study of hidden electrical commodity cost. The study will start with theory from many reliable sources. After that, the study will make model to give visualizations about hidden electrical commodity. Model will not complete without case study, this case study will give more visualizations even to non electrical engineering peer. The last purpose of this study is making the comparison between paying TDL and paying the service fee from this study. This study will make model of reactive power unbundling tariff in Indonesia. Independence Power Producer (IPP) gives PLN more excess energy but as a company, IPP will operate to make profit and advantage as big as they can. This profit and advantages will be the economic aspect of the service fee. Captive Power was new chronology in electrical engineering world and as utility company; we must prepare to anticipation this condition. Indonesian Electrical Utility Company CEO with letter number no 03093/101/DIRUT/2010 has forbidden Captive Power. But there are some consumers that really need captive power and the existing one so the charge will base on that. Industry consumer has low Power Factor, this low Power Factor will be the economic aspect of the service fee. Arc Furnace costumers has same characteristic with another industry costumers but they operate theirs with arc furnaces. The risk of using arc furnace will be the economic aspect of the service fee.
  • Keywords
    arc furnaces; electric generators; power factor correction; power system economics; power system interconnection; reactive power; tariffs; TDL; arc furnace customer generator; captive power; electrical commodity cost; independence power producer; industrial customer generator; interconnection service fee; reactive power unbundling tariff; Business; Electricity; Furnaces; Generators; Harmonic analysis; Power generation; Reactive power; Arc Furnace Industrial Consumers; Captive Power Producer; Industrial Consumers; Parallel Operation; Reactive Power;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Engineering and Informatics (ICEEI), 2011 International Conference on
  • Conference_Location
    Bandung
  • ISSN
    2155-6822
  • Print_ISBN
    978-1-4577-0753-7
  • Type

    conf

  • DOI
    10.1109/ICEEI.2011.6021640
  • Filename
    6021640