DocumentCode
334139
Title
Performance of the CESR high luminosity interaction region
Author
Henderson, S.
Author_Institution
Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
291
Abstract
In November 1995, the Cornell Electron Storage Ring (CESR) began Phase II operations. The CESR/CLEO Phase II upgrade involved the installation of a silicon vertex detector for the CLEO experiment, and an interaction region optimized for a small-radius (2 cm) beampipe and bunch-train collisions at total beam currents of 600 mA. The operating experience of the CESR Phase II interaction region is reviewed
Keywords
beam handling equipment; beam handling techniques; colliding beam accelerators; electron accelerators; storage rings; 4 cm; 600 mA; CESR high luminosity interaction region performance; CESR/CLEO Phase II upgrade; Cornell Electron Storage Ring; Phase II operations; bunch-train collisions; operating experience; small-radius beampipe; Apertures; Design optimization; Electrons; Laboratories; Orbits; Phase detection; Radiation detectors; Silicon radiation detectors; Storage rings; Vacuum systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749621
Filename
749621
Link To Document