• DocumentCode
    334454
  • Title

    Kicker system for 8 GeV proton injection

  • Author

    Qunell, D. ; Jensen, C. ; Tinsley, D.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • Volume
    1
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    1287
  • Abstract
    This kicker functions to inject 6 batches of 8 GeV beam vertically into the Fermilab Main Injector from the Booster. The trajectory of this beam must be bent 1.05 mr to place it onto equilibrium orbit. This kicker system produces a nominal integrated field kick of 0.309 kG-m. Specifications require a 1.6 microsecond pulse with a 50 ns risetime (1%-99%) and a 150 ns falltime (99%-5%). The system is comprised of three magnets and power supplies. Each is composed of a resonant charger, a 25 Ω PFL, a thyratron-based pulsed power supply, a ferrite “C” magnet, and a FluorinertTM-cooled resistive load. Design details and measurements are presented
  • Keywords
    accelerator RF systems; accelerator magnets; electromagnets; particle beam injection; proton accelerators; pulsed power supplies; thyratrons; 25 ohm; 8 GeV; Fermilab Main Injector; Fluorinert-cooled resistive load; equilibrium orbit; ferrite C magnet; kicker functions; proton injection; resonant charger; thyratron-based pulsed power supply; Capacitance measurement; Impedance measurement; Magnetic field measurement; Magnets; Power supplies; Protons; Pulse measurements; Pulsed power supplies; Resonance; Thyratrons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.750002
  • Filename
    750002