DocumentCode
335062
Title
Commissioning of SPRING-8 linac control system
Author
Sakaki, H. ; Yoshikawa, H. ; Asaka, T. ; Hori, T. ; Itoh, Y. ; Kuba, A. ; Mizuno, A. ; Suzuki, S. ; Taniuchi, T. ; Yanagida, K. ; Yokomizo, H.
Author_Institution
Kamigori, Hyogo, Japan
Volume
2
fYear
1997
fDate
12-16 May 1997
Firstpage
2511
Abstract
After a year from the installation of linac components, we have started the beam commissioning and accelerated the development. We think that the installation time is very short. As one of the answers of this, we follow the success of automatic RF conditioning. It works very well job, and the RF conditioning had finished for 400~550 hours. The conditioning system is based on VME computers and Work Station (WS). And, at the beam commissioning, we have designed new type beam fluctuation monitor using image process. This monitor is very useful for the measurement of energy fluctuation. In this paper we report the history of the construction and the beam commissioning on the linac control system
Keywords
accelerator RF systems; accelerator control systems; electron accelerators; linear accelerators; RF conditioning; SPRING-8 linac control system; VME computers; automatic RF conditioning; beam commissioning; beam fluctuation monitor; energy fluctuation; linac components; Acceleration; Automatic control; Computerized monitoring; Control systems; Energy measurement; Fluctuations; Linear particle accelerator; Particle beams; Radio frequency; Structural beams;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.751257
Filename
751257
Link To Document