• DocumentCode
    3356290
  • Title

    Research on production planning and scheduling of large-piece OKP enterprises

  • Author

    Min, Lv ; Gang, Wang ; Ying, Che

  • Author_Institution
    Eng. Ind./Adv. Manuf. Technol. Center, Harbin Inst. of Technol., Harbin, China
  • fYear
    2010
  • fDate
    26-28 June 2010
  • Firstpage
    3020
  • Lastpage
    3023
  • Abstract
    Based on the steam turbine manufacturers, the production characteristics of large-piece OKP (One-of-a-Kind Production) enterprises is analyzed, and the controlling ideas of production planning and scheduling on plant level is proposed. Moreover, by combining heuristic algorithm based on rules with fuzzy algorithm, the formulating method of production planning and scheduling on plant level is introduced, and is used for the production control of large-piece OKP enterprises.
  • Keywords
    fuzzy set theory; heuristic programming; production control; production planning; scheduling; steam turbines; fuzzy algorithm; heuristic algorithm; large-piece OKP enterprises; one-of-a-kind production; plant level; production planning; production scheduling; steam turbine manufacturers; Dynamic scheduling; Finishing; Heuristic algorithms; Job shop scheduling; Manufacturing; Materials requirements planning; Production planning; Scheduling algorithm; Turbines; Uncertainty; fuzzy algorithm; heuristic algorithm; large-piece OKP enterprises; production planning and scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-7737-1
  • Type

    conf

  • DOI
    10.1109/MACE.2010.5536058
  • Filename
    5536058