    20 kV overhead lines with covered conductors

  • Author

    Panosch, W. ; Schongrundner, K. ; Kominek, K.

  • Author_Institution
    EVN AG, Austria
  • Volume
    1
  • fYear
    2001
  • fDate
    2001
  • Abstract
    The experiences of an Austrian utility, an overhead line fittings producer and a conductor company are reported in this paper. Aerial bundled conductor systems for 400 V are in use with good results by the Lower Austrian Utility EVN and the next step was the introduction of covered conductors for 20 kV. Despite the extreme winter conditions in the Year 95/96 and in subsequent years, breakdowns occurred to a less degree. Faults by snow, hoarfrost, by wind and storm or by iceshedding were minimal. Following permission from the relevant Government ministry, a test line was erected with reduced distances phase to phase. In this project, called Hackbichl, smaller lanes through the forests were permitted. Experiences with regard to protection against overvoltage and partial discharges are discussed
  • Keywords
    overhead line conductors; overvoltage protection; partial discharges; power overhead lines; power transmission faults; power transmission protection; project engineering; 20 kV; 400 V; Austria; Government ministry; Hackbichl; aerial bundled conductor systems; breakdowns; electric utility; experiences; overvoltage protection; partial discharges protection; projects; winter conditions;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
  • Conference_Location
    Amsterdam
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-735-7
  • Type

    conf

  • DOI
    10.1049/cp:20010691
  • Filename
    942791