• DocumentCode
    3406808
  • Title

    Scheduling for minimum dependence in FSMs

  • Author

    Huang, S.C.-Y. ; Wolf, W.H.

  • Author_Institution
    Dept. of Electr. Eng., Princeton Univ., NJ, USA
  • fYear
    1993
  • fDate
    7-11 Nov. 1993
  • Firstpage
    446
  • Lastpage
    449
  • Abstract
    We present a scheduling algorithm for controllers which reduces cycle time in datapath-controller systems. The algorithm chooses a schedule to reduce the primary output´s dependence on late-arriving inputs - a minimum-dependence structure leads to a shorter system cycle time. Our algorithm accurately predicts from a behavioral description FSM properties which are correlated with fast logic. Experimental results show that the algorithm improves delay in critical outputs and control step-cycle time product.
  • Keywords
    finite state machines; behavioral description; control step-cycle time product; controllers; cycle time; datapath-controller systems; delay; finite state machines; minimum dependence; scheduling; Control system synthesis; Control systems; Delay effects; Delay systems; High level synthesis; Logic design; Prediction algorithms; Scheduling algorithm; Time factors; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer-Aided Design, 1993. ICCAD-93. Digest of Technical Papers., 1993 IEEE/ACM International Conference on
  • Conference_Location
    Santa Clara, CA, USA
  • Print_ISBN
    0-8186-4490-7
  • Type

    conf

  • DOI
    10.1109/ICCAD.1993.580095
  • Filename
    580095